IP TechMatchformerly
DoD TechMatch
SearchBrowseSign in
← MS

Energy Technologies facilities in MS

1 facilities

Facility · FAC-71668 Historical

CERL HVAC Test Facility

Vicksburg, MS

The air distribution system has a primary air intake with a mixed air section consisting of mechanically linked outdoor and return air dampers and a separately actuated exhaust damper. The supply fan feeds a single or dual-duct air system (as dictated by the particular system configuration being used). The return air duct is arranged so the return fan can be used or by-passed. Both the supply and return fans are modulated by variable speed drive units. A separate ventilation system contains an outdoor environment simulator (OES) consisting of heating and cooling coils, which permit conditioning of outdoor air to establish desired test conditions. Airflow measurement stations are installed in each primary and branch duct.

Independent Historical Archive

A preservation of records from DoD TechMatch and its successor IP TechMatch — a technology-transfer portal operated by the Center for Innovation (CFI) under a U.S. Air Force Research Laboratory Partnership Intermediary Agreement (No. FA8650-10-3-9700). Recovered from public web archives. Not affiliated with, endorsed by, or currently operated by the U.S. Department of Defense. Records reflect their archived state and may be outdated or unverified.

Restored & maintained by

Wysebridge ↗

Technology-transfer intelligence, restored for the public record.