Historicalarchived
Paint Testing
Vicksburg, MS
In the past the majority of our work has consisted of testing individual batches of paint proposed for use on specific projects. The objective of this type of testing was rapid response and low cost. Testing consisted of performing a range of both formulation and performance tests as required by the specification. In order to reduce costs and provide a response in a minimum amount of time, not all specification tests were performed. Most paints were tested for a flat rate which was paid by the government installation where the painting was to take place. Results were provided in 1-2 weeks depending on the length of the tests performed.
Laboratory
- ERDC Construction Engineering Research Laboratory
Category
- Materials
Provenance
- Original
- https://dodtechmatch.com/dod/lab/viewfacility.aspx?id=71672
- Archived copy
- Wayback Machine snapshot
This record was recovered from a public web archive of dodtechmatch.com and is preserved for historical reference. It may be outdated. Not affiliated with the U.S. Department of Defense. Contact details from the original listing have been withheld.